Greetings in the Precious Name of our Saviour the Lord Jesus Christ
Wow did we get a lot done on yesterday. We covered all the sprinkler pipes on the second floor with boards and painted them with two coats of paint. We painted all the door frames with three more coats of paint. The sprinkler system was installed part way in the basement. The heat was installed and looped together on the second floor. The sheet rockers put another coat of mud on. The carpet people preped the floor and are putting down pad and strips today. Were getting there.
Today we will do much of the same. Pray much for us as we work tirelessly to get this project completed.
A Servant for Christ
Pastor Todd Bell
No comments:
Post a Comment